Menu

How it works

From First Sign-In to a Signed Verdict

Twelve steps, each one in plain sight. Nothing is written without a named approval, and nothing passes by omission.

Part 1 of 5

Set Up the Move

Name the deal, connect both sides, and test each connection before anything depends on it.

  1. Sign In

    Accounts are by invitation. An admin invites each person and gives them a role.

  2. Create a Project

    Name the acquired company, pick the move, choose a full migration or verification only, and set the cutover date.

  3. Connect the Two Systems

    Upload the source's export files or connect to the source live. Pick the target, or the built-in Practice Ledger for a dry run. Each connection is tested before it can be used.

Part 2 of 5

Read and Check

Before anything moves, see exactly what was read and what is wrong with it.

  1. Review What Was Read

    Zipper shows every file, how many records it read, and every row it could not read and why. Nothing is dropped quietly.

  2. Validate

    Named checks run on the stored snapshot: required columns, blank required values, debits equal to credits on opening balances, document totals equal to their lines. Each one shows pass, fail or unverified, with the records behind it.

Part 3 of 5

Map and Approve

Zipper proposes. A named person on your side decides.

  1. Map, Section by Section

    Accounts first. Zipper proposes each pairing with a confidence score and how the match was made. Your approver confirms it, changes it, creates a new account or excludes the record.

  2. Approve

    One approval per section, by a named person. Approval freezes that section's mapping.

The Zipper mapping screen for accounts. Source accounts are listed on the left and proposed target accounts on the right, joined by an open tooth. Each proposal reads Proposed, not confirmed, with a Confirm button and a Change target link.
Mapping: a proposed pairing counts for nothing until a person confirms it.Sample data from a practice run

Part 4 of 5

Load and Prove

Write the approved records, read the target back, and put a signature on the result.

  1. Load

    Approved sections load in dependency order. Each record gets a status and the target's ID. A failure names the record and the cause, and running the load again never writes twice.

  2. Tie Out

    Zipper reads the target back and compares: record by record, count and amount by type, the trial balance account by account as of cutover, receivables and payables open items against their control accounts, and aging bucket by bucket.

  3. Verdict

    Go, no-go or incomplete, with every cause named. Zipper's reviewer signs. If anything under a signed verdict changes, the verdict is marked stale until it is signed again.

The Zipper project overview. Each section of the move is one row: the source count on the left, the target count on the right and a closed tooth between them. Accounts, customers, suppliers and items each read Loaded and tied.
The overview: source on the left, target on the right, one tooth per section.Sample data from a practice run

Part 5 of 5

Keep the Evidence and Close Out

The proof leaves with you. The data does not stay with Zipper.

  1. Keep the Evidence

    Export the report as PDF and CSV, and the evidence pack with its hashed manifest. Anyone can check a pack on the Verify page or offline.

  2. Close Out

    If it is needed, roll back: Zipper removes only the records it created, then reads the target to confirm they are gone. Your data is deleted within 30 days of completion, with a Certificate of Data Destruction. Approved mappings are saved for the next deal.

Scope

What to Plan For

The practical questions, answered before the first call.

  • Which Systems

    The first moves are Sage to QuickBooks Online, and Sage customers and suppliers to HubSpot. HR systems are scoped before signing.

  • Who Runs It

    Your team, in the app, or Zipper end to end as a managed delivery add-on. Either way, Zipper signs the verdict.

  • How Long It Takes

    The migration run itself takes days. The full job, from scoping through mapping approval, a test run, cutover and sign-off, is planned at roughly two to four weeks. ERP moves and larger record counts sit at the long end. These are planning estimates, not measured results.

  • If Someone Else Already Did the Move

    Buy verification only. Point Zipper at the system that was loaded; it pairs the records, runs the same tie-out and signs a verdict on the result. Zipper cannot write to the target in this mode.

See It Against Your Own Move.

Tell us which systems the data is moving between, roughly how many records, and when cutover is planned.